§ 9.02.133. Connection fees  


Latest version.
  • For each water service connection, the connection fee shall be based upon meter size in accordance with the following schedule:

    Size of Meter Connection Charge
    ¾″ $ 50.00
    1″ 100.00
    1½″ 150.00
    2″ 250.00
    3″ 600.00
    4″ 1,000.00
    over 4″ 1,500.00

     

(Ord. 1046 § 1 (part), 1992: Ord. 1041 § 1 (part), 1992.)